| |
| Issue |
Title |
| |
| No 2 (2012) |
PHYSICAL MODELING OF ROCK PRESSURE MANIFESTATIONS DURING MINING OF BLIND CLOSE-SET ORE DEPOSITS BY CAMERAS |
Abstract
PDF (Rus)
|
|
V.O. Shekhovtsova, V.N. Fryanov, V.S. Shekhovtsov |
| |
| No 2 (2012) |
THE MAIN BOUNDARIES IN THE COLONIZATION OF THE ANCIENT SIBERIAN CONTINENT |
Abstract
PDF (Rus)
|
|
Ya.M. Gutak, V.A. Antonova, Z.A. Tolokonnikova |
| |
| No 2 (2013) |
ABOUT THE AGE OF THE IRON-SMELTING FIRES IN THE KUYAKTANAR TUNNEL (MOUNTAIN ALTAI) |
Abstract
PDF (Rus)
|
|
Ya.M. Gutak, G.G. Rusanov |
| |
| No 1 (2013) |
APPLICATION OF UNDERGROUND DIRECTIONAL DRILLING STATIONS FOR EXTRACTION OF METHANE AND CONTROL OF COAL SELF-IGNITION DURING DEVELOPMENT OF POWERFUL COAL PLATES |
Abstract
PDF (Rus)
|
|
M.G. Koryaga |
| |
| No 1 (2013) |
CLIMATE AND GLACIATION DYNAMICS IN THE SOUTH OF THE KUZNETSKY ALATAU DURING THE LATE PLEISTOCENE AND HOLOCENE, BASED ON STRATIGRAPHIC AND RADIOCARBON DATA |
Abstract
PDF (Rus)
|
|
M.M. Adamenko, Ya.M. Gutak, M.E. Evdokimov |
| |
| No 1 (2012) |
MATHEMATICAL MODELING OF DISPLACEMENT AND STRESS DISTRIBUTIONS IN A PIECEWISE-HOMOGENEOUS ISOTROPIC MASSIF |
Abstract
PDF (Rus)
|
|
A.B. Tsvetkov, V.N. Fryanov |
| |
| No 1 (2012) |
ROCK SHIFTS AT THE TASHTAGOL DEPOSIT AS A REFLECTION OF GEODYNAMIC PROCESSES |
Abstract
PDF (Rus)
|
|
T.V. Lobanova |
| |
| No 4 (2013) |
ANALYSIS OF GAS-DYNAMIC PROCESSES AND THEIR CONTROL METHODS IN THE AREA OF CLEANING OPERATIONS |
Abstract
PDF (Rus)
|
|
I.A. Pozdeev |
| |
| No 4 (2013) |
METHOD FOR ASSESSING THE DEFORMATION PROCESSES OF A NON-UNIFORM COAL-MINING MASSIF DURING COAL DEPOSITS DEVELOPMENT |
Abstract
PDF (Rus)
|
|
A.M. Nikitina |
| |
| No 2 (2014) |
METHOD FOR FORMING A SAFETY CUSHION WHEN MINING BLIND, ADJACENT ORE DEPOSITS |
Abstract
PDF (Rus)
|
|
V.O. Shekhovtsova, V.S. Shekhovtsov, O.V. Zalesskaya |
| |
| No 2 (2014) |
SOIL STRUCTURE FEATURES OF MAN-MADE LANDSCAPES LOCATED IN THE FOREST-STEPPE ZONE OF KUZBASS |
Abstract
PDF (Rus)
|
|
A.M. Shipilova, I.P. Belanov |
| |
| No 3 (2013) |
JUSTIFICATION OF ANCHORING PARAMETERS FOR MINING WORKINGS CARRIED OUT IN THE FIRST PLATE OF PLATE III UNDER CONDITIONS OF DISJUNCTIVE AND PLICATIVE DISRUPTIONS WITH CRUSHED AND WATERED ROCKS IN THE CONDITIONS OF OAO "SHAKHA "SIBIRGINSKAYA" |
Abstract
PDF (Rus)
|
|
S.V. Rib, A.M. Nikitina, D.M. Borzykh |
| |
| No 3 (2013) |
VOLCANOUS FORMATIONS IN THE TUEKTIN FORMATION (MIDDLE DEVON) OF THE CENTRAL PART OF THE MOUNTAINAL ALTAI |
Abstract
PDF (Rus)
|
|
Ya.M. Gutak, V.I. Krupnichnikov |
| |
| No 1 (2014) |
INVESTIGATION OF GEODYNAMIC ACTIVITY OF SHEREGESHEVSKY DEPOSITS ACCORDING TO GPS OBSERVATIONS IN VARIOUS BUILDING BLOCKS |
Abstract
PDF (Rus)
|
|
T.V. Lobanova, S.A. Lobanov |
| |
| No 1 (2014) |
ASSESSMENT OF GEOLOGICAL AND ECONOMIC INDICATORS OF A RESOURCE-EFFICIENT STRATEGY FOR SEARCHING FOR OIL DEPOSITS IN THE PRE-JURASSIC FOUNDATION OF THE CENTRAL PART OF WESTERN SIBERIA |
Abstract
PDF (Rus)
|
|
V.I. Isaev |
| |
| No 1 (2014) |
DETERMINATION OF THE DISTRIBUTION PATTERN OF CONCENTRATION OF METHANE AT THE MAIN POINTS OF THE EXCAVATION SECTION |
Abstract
PDF (Rus)
|
|
I.A. Pozdeev |
| |
| No 4 (2014) |
METHOD FOR PREPARING INITIAL DATA FOR SOLVING TWO-DIMENSIONAL NUMERICAL MODELING PROBLEMS OF NON-UNIFORM ANGULAR TARGETS |
Abstract
|
|
S.V. Rib, V.V. Basov |
| |
| No 1 (2015) |
STATUS AND PROSPECTS FOR THE DEVELOPMENT OF MINING EDUCATION AND SCIENCE AT THE SIBERIAN STATE INDUSTRIAL UNIVERSITY |
Abstract
PDF (Rus)
|
|
Ya.M. Gutak, E.V. Pugachev, I.S. Semina, V.N. Fryanov, V.V. Chaplygin |
| |
| No 1 (2015) |
COMPARATIVE ANALYSIS OF TECHNOLOGIES FOR PREPARING A MINING PILLAR IN THE PROCESS OF DEVELOPING A POWERFUL COAL PLATE |
Abstract
PDF (Rus)
|
|
V.V. Mikunov, V.A. Voloshin, S.V. Rib |
| |
| No 1 (2015) |
INDUSTRIAL TESTING OF THE TERMITON X4 DUST-CONTROLLED SPARTACING HOLE |
Abstract
PDF (Rus)
|
|
G. N. Volchenko, B. D. Isakharov, V. N. Fryanov, N. G. Volchenko, E.A. Volkov, V. V. Prib |
| |
| No 2 (2015) |
STATE AND DIRECTIONS OF DEVELOPMENT OF THE RESEARCH PROGRAM TECHNOLOGIES OF UNDERGROUND COAL MINING |
Abstract
PDF (Rus)
|
|
V.N. Fryanov |
| |
| No 2 (2015) |
CALCULATION OF SEISMO-SAFE DISTANCES IN CASE OF MASS EXPLOSIONS TAKING INTO ACCOUNT THE SCHEMES OF EXPLOSION OF WELL CHARGE USING NON-ELECTRIC SYSTEM OF INITIATION |
Abstract
PDF (Rus)
|
|
I.V. Mashukov, V.V. Chaplygin |
| |
| No 2 (2015) |
PRACTICAL THEORY OF CONVEYOR BELT CLEANING |
Abstract
PDF (Rus)
|
|
V.V. Chaplygin, E.D. Nikolaev |
| |
| No 2 (2015) |
LOKHOV-PRAGUE MSHANKS OF THE WESTERN PART OF THE ALTAI-SAYAN FOLDED REGION |
Abstract
PDF (Rus)
|
|
O.P. Mezentseva, Yu.V. Yu.V. Udodov |
| |
| No 2 (2015) |
MULTIPLE-PURPOSE POSSIBILITIES OF USING COLTUBING TECHNOLOGIES FOR DEGASATION OF EXHAUSTED SPACE, MONITORING AND FIRE CONTROL |
Abstract
PDF (Rus)
|
|
M.G. Koryaga |
| |
| 1 - 25 of 76 Items |
1 2 3 4 > >>
|