IMPROVEMENT OF NON-PURPOSE PROTECTION METHODS OF REUSABLE PREPARATION WORKINGS
Abstract
Preparatory workings provide for the preparation of individual parts of the mine field and the development of extraction pillars. In order to accommodate a significant amount of equipment, ensure uninterrupted operation of transport and allow a large amount of air to pass through, it is necessary that the cross-section of the preparatory workings meet the requirements of the Safety Rules. At the same time, in order to maintain the cross-sectional area, permissible gaps between the walls of the working and transport during operation, it is necessary to use reliable security methods. In the mines of the Kuznetsk Basin, coal pillars are used to protect the extraction workings adjacent to the longwall; as a rule, they are left at the junction of the longwall and the working. Pillarless technology for the preparation and development of extraction pillars accounts for about 30%.
About the Authors
A.V. RemizovRussian Federation
S.V. Rib
Russian Federation
References
1. Ryzhkov Yu.A., Ignatov E.V. Comparative assessment of mining and geological conditions of mining, equipment and technology for underground coal mining in Russia and abroad // Bulletin of KuzSTU. 2006. No. 1. pp. 67-74.
2. Zborshchik M.P., Sin A.F., Pilyu3. Guidelines for the rational location, protection and maintenance of mining operations in coal mines of the USSR. - L.: VNIMI, 1986. – 222 p.
3. Kolchik E.I., Kolchik I.E., Pilyugin V.I. The influence of tectonic disturbance on the conditions for conducting and maintaining reservoir workings. – Donetsk: ed. DonNTU, 2007. – 194
4. Stulishenko A.Y. Forecasting the convergence of rocks of the contour of preparatory workings carried out after lava on shallow strata: abstract of the dissertation. for the scientific competition. degrees. Candidate of Technical Sciences. – Donetsk: DonNTU, 2002. – 20 p.
5. Pilyugin V.I., Gavrish N.N., Miroshnichenko A.I. The influence of cavities of natural and man-made origin on the stability of reservoir preparatory work. – In: Collection of scientific articles. – Donetsk: ed. DonNTU, 2007. pp. 148 – 152
6. Voloshin A.I., Ryabtsev O.V., Koval I. Determination of the rational width of the rear sight between the transport highway and the lava being mined // Coal of Ukraine. 2011. No. 8. pp. 11-13.
7. Rutkov K.I., Belikov V.V., Belikova N.V. Protection of reusable preparatory workings with bollards made of wooden and concrete blocks // Coal. 2000. No. 10. pp. 59-61.
8. Ovcharenko G.V., Vasiliev S.V., Cholak E.O. Mine tests of technology for excavating thin steep strata using pneumatic fasteners
Review
For citations:
Remizov A., Rib S. IMPROVEMENT OF NON-PURPOSE PROTECTION METHODS OF REUSABLE PREPARATION WORKINGS. Bulletin of the Siberian State Industrial University. 2017;(2):9-11. (In Russ.)











