TECHNOLOGICAL AND MINERALOGICAL STUDIES OF THE PROCESS OF PROPHYLAXIS OF IRON ORE CONCENTRATE WITH CALCINED LIMESTONE
https://doi.org/10.57070/2304-4497-2023-4(46)-107-111
Abstract
Technological and mineralogical studies of samples of burnt limestone and pre-treated concentrate were performed. The processes of changing the mineral composition and moisture content of the MMC concentrate during its prophylaxis with burnt limestone have been studied. The mechanism and kinetics of water binding of wet iron ore concentrate in the process of mineral hydration are described. It is shown that almost all the minerals of burnt limestone participate to a certain extent in the process of concentrate prophylaxis. It has been experimentally established that the prophylaxis process takes place during the day, but the process is most intense in the first 4 hours after mixing the wet concentrate with burnt limestone.
About the Authors
Natalia I. KuvshinnikovaRussian Federation
Leading Engineer of the Laboratory of Ecology and Integrated Use of Mineral Waste
Arnold A. Permyakov
Candidate of GeologoMineralogical Sciences, scientific supervisor of the Laboratory of Ecology and Integrated Use of Mineral Waste
Mikhail V. Temlyantsev
Dr. Sci. (Eng.), Prof. of the Department of Thermal Power Engineering and Ecology
References
1. Bazilevich S.V., Vegman E.F. Agglom-eration. Moscow: Metallurgiya, 1967:367. (In Russ.).
2. Berezhnoi H.H., Bulychev B.V., Kostin A.I. Production of iron ore pellets. Moscow: Nedra, 1977:240. (In Russ.).
3. Napol'skikh S.A., Gel'bing R.A., Sukharev A.G. Method of drying of finely ground iron ore concentrate. Pat. 2425155 RF; opubl. 27.07.2011. (In Russ.).
4. Hong C., Xing Y., Si Y.X. et al. Lime-Mediated Sewage Sludge and Gas Ash use as Metallurgy Sintering Ingredients. Advanced Materials Research. 2013;779-780(9):1623‒1628.
5. Gen-Sheng Feng, Sheng-Li Wu, Hong-Liang Han et al. Sintering characteristics of fluxes and their structure optimization. International Journal of Minerals, Metallurgy and Materials. 2011:18(6):270‒276.
6. Loo C. E., Ellis B. G. Changing Bed Bulk Den sity and other Process Conditions during Iron Ore Sintering. ISIJ International. 2014;54(1):19‒28.
7. Permyakov A.A., Kuvshinnikova N.I., Kalinogorskii A.N., Butov P.Yu., Ganzhenko I.M., Osokin N.A. Technological and mineralogical studies of the kinetics of processes in the prevention of concentrate produced at the Abagursky branch of JSC “EURASRUDA”. In: Metallurgy: Technologies, management, innovation, quality. All-Russian Scientific and practical conferences, 8-11 October 2013; 2013:12‒17. (In Russ.).
8. Bersenev I.S., Klein V.I., Zarshchikov P.I., Osokin N.A., Shcheglov V.N. Production notified to agglomeration machine MAK-90. Stal'. 2013;4:2‒5. (In Russ.).
9. Boiton R.S. Chemistry and technology of lime. Moscow: Stroiizdat, 1972:240. (In Russ.).
10. Kulibin V.A. Preparation of ores for smelting. Moscow: Metallurgizdat, 1959:518. (In Russ.).
Review
For citations:
Kuvshinnikova N., Permyakov A., Temlyantsev M. TECHNOLOGICAL AND MINERALOGICAL STUDIES OF THE PROCESS OF PROPHYLAXIS OF IRON ORE CONCENTRATE WITH CALCINED LIMESTONE. Bulletin of the Siberian State Industrial University. 2023;(4):107-111. (In Russ.) https://doi.org/10.57070/2304-4497-2023-4(46)-107-111